Jobs.ca
Jobs.ca
Language
Trillium Rail Partners logo

Architectural Technical Coordinator

Mississauga, Ontario, Canada
Senior Level
Full-Time

Top Benefits

Medical Insurance
Dental Insurance
Vision Insurance

About the role

About The Project

The Eglinton Crosstown West Extension will bring the Eglinton Crosstown LRT another 9.2 kilometres farther west, creating a continuous rapid transit line from the east end of Toronto into Mississauga. The Stations, Rail, and Systems (SRS) package encompasses the design, construction, integration, and commissioning of key project components.

Position Overview

The Architectural Technical Coordinator will play a key role in coordinating and managing architectural design and technical documentation throughout the project lifecycle. This position supports the project team by reviewing drawings, resolving design issues, and ensuring architectural deliverables align with project specifications, schedules, and construction requirements.

Key Responsibilities

Coordinate architectural and technical aspects of the project between consultants, engineers, and construction teams. Review architectural drawings, shop drawings, and submittals for compliance with design intent and specifications. Support the project team in resolving design and construction coordination issues. Participate in technical and coordination meetings with design consultants, subcontractors, and internal teams. Track and manage architectural design changes and revisions, ensuring accurate and timely distribution. Assist in the preparation of documentation required for permits, design changes, and as-built drawings. Monitor quality control for architectural components during construction. Provide technical guidance and clarification to the site and project management teams. Ensure that all architectural work complies with applicable building codes, standards, and client requirements.

Qualifications

Diploma or Degree in Architecture, Architectural Technology, or related field. Minimum 5+ years of experience in architectural coordination or technical roles on ICI or infrastructure projects Strong understanding of architectural detailing, building codes, and construction methods. Proficient with AutoCAD, Revit, and other design coordination software. Excellent communication, organization, and problem-solving skills. Ability to work collaboratively with multidisciplinary teams in a fast-paced project environment.

What TRP Can Offer You

Competitive Salary Medical, dental, and vision insurance Employer Matching Retirement Program Life insurance

At TRP, we are committed to providing an environment of mutual respect where equal opportunities are available to all applicants and teammates. Accommodation is available upon request for applicants throughout the recruitment and selection process.

We thank all applicants for their interest. However, only those selected for an interview will be contacted.

About Trillium Rail Partners

11-50

Trillium Rail Partners (TRP) is a consortium of Amico Major Projects, Alberici Constructors, and Acciona Infrastructure Canada, working closely with Metrolinx to deliver the Stations, Rail, and Systems (SRS) package for the Eglinton Crosstown West Extension, a transformative 9.2 km expansion of Toronto’s light rail network.

The consortium signed a progressive design-build Development and Master Construction Agreement (DMCA) in August 2025, to enable the commencement of early construction works and to work closely with Metrolinx to collaboratively progress the design, optimize risk allocation, and establish pricing for key project elements ahead of the main construction works.

The Eglinton Crosstown West Extension SRS scope includes:

  1. Design and construction of seven new stations, including a mix of underground, elevated, and at-grade facilities
  2. Installation of track and railway systems
  3. Integration of communications, ventilation, and other support systems for the new line
  4. Integration works at Mount Dennis Station to connect the extension with Line 5 Eglinton
  5. Utility relocations and road modifications along Eglinton Avenue West

Once complete, the Eglinton Crosstown West Extension will extend Line 5 westward from Mount Dennis Station to Renforth Drive, improving connectivity and supporting sustainable transit solutions for the Greater Toronto Area.

Together, we are committed to delivering world-class infrastructure that benefits communities and shapes the future of urban mobility.

Similar Jobs