About the role
What is the project?
The Pickering Nuclear Generating Station refurbishment program involves designing and building a new deep-water intake in Lake Ontario to improve the plant's cooling system. This will involve:
- A 1.5 km-long tunnel, built by a pressurized TBM (10.15 m diameter slurry TBM);
- Two vertical shafts (onshore and offshore);
- An offshore modular intake structure, resting on the lake bed.
The project is distinguished by its proximity to an active nuclear site, requiring rigorous standards of safety, planning and coordination.
What you will do:
Develop and maintain the Project Controls function of the Definition and Execution Phase Plan. Lead and direct the Project controls team in accordance with those 2 phases. Manage change control, cost control and budget. Manage information system and processes.
Concretely, your tasks will be:
- Work Breakdown Structure:
o Structure all schedules, budgets, progress updates, request for payments and accrual reports according to the Works Breakdown Structure.
- Schedule Management:
o Establish the project schedule in a multi-layer scheduling model that meets the requirements of the Client (milestones, scope categories, control accounts, work packages and activities)
o Define resources at level 3 and 2 for all contract types.
o Provide native scheduling files when requested.
- Cost Management:
o Submit Oncore job set form or Ecosys version in conjunction with the Work Breakdown Structure dictionary.
- Risk:
o Establish project risk profile, including the identification of discrete risk including opportunities with overall detailed assessment of probability and impacts.
o Establish Proposed Risk Management Plan.
o Ensure alignment with the Client Project Risk Management Manual and processes.- 15 years’ experience with at least 5 years of project controls.
- Experience in a lead role on complex projects, ideally large tunnel projects throughout the project lifestyles.
- Knowledge of the Risk Management of Tunnel Works.
- CRM certification (asset).
- Experience in marine works (asset).
- Fluent in English.
About VINCI Construction
Premier groupe français et acteur mondial de premier plan de la construction, VINCI Construction réunit plus de 830 entreprises et près de 69000 collaborateurs dans une centaine de pays. Ses expertises s’étendent à l’ensemble des métiers du bâtiment, du génie civil, et des activités spécialisées associés à la construction
VINCI Construction se caractérise, outre l’étendue de sces expertises, par un modèle économique articulé en trois composantes complémentaires.
Un réseau de filiales locales :
- en France, avec VINCI Construction France, qui dispose en métropole d’un réseau solidement ancré de 450 centres de profit, et VINCI Construction Dom-Tom, représenté par une trentaine de filiales locales implantées dans les départements, territoires et collectivités d’outre-mer ;
- à l’international, avec VINCI Construction UK au Royaume-Uni; avec Warbud, SMP, Prumstav, SMS et APS Alkon en Europe centrale et enfin avec Sogea-Satom en Afrique ;
Des métiers de spécialités exercés à l’échelle mondiale : Soletanche Freyssinet (fondations et technologies du sol, structures, nucléaire) ; Entrepose Contracting (infrastructures parapétrolières et gazières) ; Une division dédiée au management et à la réalisation de projets complexes, avec VINCI Construction Grands Projets, VINCI Construction Terrassement et Dodin Campenon Bernard, qui interviennent sur le marché des grands ouvrages de génie civil et de bâtiment, en France et à l’international. VINCI Construction est le creuset de la culture d’entrepreneur du Groupe et de son schéma de management, qui conjugue décentralisation, travail en réseau, autonomie et responsabilité individuelle de l’encadrement, valorisation des hommes et réactivité des organisations.
About the role
What is the project?
The Pickering Nuclear Generating Station refurbishment program involves designing and building a new deep-water intake in Lake Ontario to improve the plant's cooling system. This will involve:
- A 1.5 km-long tunnel, built by a pressurized TBM (10.15 m diameter slurry TBM);
- Two vertical shafts (onshore and offshore);
- An offshore modular intake structure, resting on the lake bed.
The project is distinguished by its proximity to an active nuclear site, requiring rigorous standards of safety, planning and coordination.
What you will do:
Develop and maintain the Project Controls function of the Definition and Execution Phase Plan. Lead and direct the Project controls team in accordance with those 2 phases. Manage change control, cost control and budget. Manage information system and processes.
Concretely, your tasks will be:
- Work Breakdown Structure:
o Structure all schedules, budgets, progress updates, request for payments and accrual reports according to the Works Breakdown Structure.
- Schedule Management:
o Establish the project schedule in a multi-layer scheduling model that meets the requirements of the Client (milestones, scope categories, control accounts, work packages and activities)
o Define resources at level 3 and 2 for all contract types.
o Provide native scheduling files when requested.
- Cost Management:
o Submit Oncore job set form or Ecosys version in conjunction with the Work Breakdown Structure dictionary.
- Risk:
o Establish project risk profile, including the identification of discrete risk including opportunities with overall detailed assessment of probability and impacts.
o Establish Proposed Risk Management Plan.
o Ensure alignment with the Client Project Risk Management Manual and processes.- 15 years’ experience with at least 5 years of project controls.
- Experience in a lead role on complex projects, ideally large tunnel projects throughout the project lifestyles.
- Knowledge of the Risk Management of Tunnel Works.
- CRM certification (asset).
- Experience in marine works (asset).
- Fluent in English.
About VINCI Construction
Premier groupe français et acteur mondial de premier plan de la construction, VINCI Construction réunit plus de 830 entreprises et près de 69000 collaborateurs dans une centaine de pays. Ses expertises s’étendent à l’ensemble des métiers du bâtiment, du génie civil, et des activités spécialisées associés à la construction
VINCI Construction se caractérise, outre l’étendue de sces expertises, par un modèle économique articulé en trois composantes complémentaires.
Un réseau de filiales locales :
- en France, avec VINCI Construction France, qui dispose en métropole d’un réseau solidement ancré de 450 centres de profit, et VINCI Construction Dom-Tom, représenté par une trentaine de filiales locales implantées dans les départements, territoires et collectivités d’outre-mer ;
- à l’international, avec VINCI Construction UK au Royaume-Uni; avec Warbud, SMP, Prumstav, SMS et APS Alkon en Europe centrale et enfin avec Sogea-Satom en Afrique ;
Des métiers de spécialités exercés à l’échelle mondiale : Soletanche Freyssinet (fondations et technologies du sol, structures, nucléaire) ; Entrepose Contracting (infrastructures parapétrolières et gazières) ; Une division dédiée au management et à la réalisation de projets complexes, avec VINCI Construction Grands Projets, VINCI Construction Terrassement et Dodin Campenon Bernard, qui interviennent sur le marché des grands ouvrages de génie civil et de bâtiment, en France et à l’international. VINCI Construction est le creuset de la culture d’entrepreneur du Groupe et de son schéma de management, qui conjugue décentralisation, travail en réseau, autonomie et responsabilité individuelle de l’encadrement, valorisation des hommes et réactivité des organisations.