Lrv Supervisor Jobs in Edmonton, Alberta, Canada
Create alert for “LRV Supervisor”
Edmonton, Alberta, Canada
Site Supervisor
Site Supervisor
Top Benefits
About the role
Who We Are
TransEd Valley Line LRT is the first piece of the Valley Line project in
Edmonton. Connecting Millwoods to downtown Edmonton, the Valley Line allows commuters to go from the South East of Edmonton to any where the LRT stops.
A typical day for the LRV Supervisor
- Supervise maintenance teams and contractors, ensuring compliance with safety and regulatory standards.
- Participates in the selection, training, supervision, and evaluation of assigned staff.
- Prioritize work at the Depot to meet train availability requirements.
- Develop and maintain interfaces with other functional areas within the business in particular Operations, to improve efficiently and maximize capacity.
- Ongoing preventative (PM), corrective (CM) and emergency maintenance (EM) on the aforementioned equipment. This relates to inspections, tests, commissioning, modifications, repairs, operation, and/or maintenance of equipment is completed to meet proper standards.
- Development and execution of contingency and emergency plans.
- Monitoring, investigating, and reporting on asset performance.
- Providing technical expertise and oversight to contracts. Ensure subcontractors, project team members and all personnel meet OH&S obligations and perform work within our safety culture respecting HSE rules.
- Ensure the application of TransEd safety practices, policies, and procedures by unionized employees.
- Liaising with key stakeholders and their representatives.
- Lead, coach, and develop their team.
- Provide leadership and direction to the team on HSE matters, technical issues, business evaluations, system improvements, maintenance strategies, resourcing strategies, contingency and emergency planning, performance evaluation and reporting, regulatory matters, etc.
- Other duties as assigned.
- Ability to work with varying shift patterns.
Skills and Qualifications
- Degree or diploma in Maintenance or a related field.
- Professional accreditation in Asset Management, Maintenance Management, or Reliability Management is an asset.
- Minimum of 2 years of supervisory experience, preferably in journey-level rail works or similar industrial electrical, electronics and/or Mechanical Trade maintenance and repair.
- Valid Alberta Class 5 driver’s license (Class 3 or Class 1 is an asset)
- Knowledge of health, safety, and environmental management processes.
- Advanced communication, planning, and technical reporting skills.
- Proficiency in Maximo and Agility software is an asset.
Why choose TransEd Valley Line LRT
TransEd is made up of hard-working, respectful and talented people who
understand and invite diversity to the workplace. We take pride in holding ourselves accountable and continuing to meet or exceed service levels for the greater Edmonton community. We ensure they receive quality services because they—along with our people—are the reason we endure and succeed. And it sure feels good helping hard-working Edmontonians get from A to B in a seamless transit experience.
What TransEd has to offer
- Community-minded workplace with a friendly team environment
- Competitive salary and yearly incentive plan
- Retirement savings plan
- Competitive benefit package featuring extended health and dental benefits
Not the right fit? Search for LRV Supervisor jobs in Edmonton, Alberta, Canada
About TransEd LRT
Construction of stage one of the Valley Line Light Rail Transit (LRT) will connect Mill Woods to downtown Edmonton with about 13.1 km of light rail transit. This stage includes 11 stops, an elevated station incorporating a transit centre and Park & Ride, and a transfer point to the existing LRT routes at Churchill Square.
The Valley Line Southeast is different from the current high-floor LRT system that Edmonton operates. The Valley Line Southeast features new, low-floor, urban-styled trains that will provide more pedestrian-friendly access with at street level stops. And, in residential and commercial areas, embedded tracks will be integrated to the established design and traffic flow of the area.
Pre-construction work began in March 2016 and stage one of the City of Edmonton's Valley Line LRT is expected to be operational in 2023.